GEA Innocent

Design and built of the complete electrical and pneumatic installation of a new greenfield factory:

  • Engineering: Electrical, and pneumatics design​

  • Welding of RVS structures and cable trays.​

  • Design and built of MCC’s(> 70m and 12.000A) and control panels​

  • Wiring and connection of motors, frequency drives and instrumentation.​

  • Instrument air​

  • Network structure including fiber optic network​

  • Execution: Installation, testing and commissioning​

  • > 200 drives, >150km cables​

  • IO-tests​

  • 30.000 onsite-hours

Industrial Automation

PMT

Information about the project

Location

Harbour Rotterdam, Nederland

Execution time

2021

Client

GEA Process Engineering

Budget

+- € 2.400.000

Project description
  • Engineering: Electrical, and pneumatics design​

  • Welding of RVS structures and cable trays.​

  • Design and built of MCC’s(> 70m and 12.000A) and control panels​

  • Wiring and connection of motors, frequency drives and instrumentation.​

  • Instrument air​

  • Network structure including fiber optic network​

  • Execution: Installation, testing and commissioning​

  • > 200 drives, >150km cables​

  • IO-tests​

  • 30.000 onsite-hours

Floris
Project Manager PMT
Ik ben trots dat we met ons team de volledige scope van engineering, bordenbouw en IO-testing in eigen beheer hebben kunnen behartigen. Bovendien mochten we voor de toestellen ook een deel van de bedrijfname en instrumentatie verzorgen.

Bekijk hier onze projectvideo

Contacteer ons

Bent u op zoek naar een partner voor de realisatie van uw E&I project? Aarzel dan niet om ons te contacteren.