Puming Flood Prevention

Pumping - Flood Control
Industrial Automation

Information about the project

Location

Hanoi City, Vietnam

Principal

CFE

Execution time

2013 - 2015

Client

Hanoi Sewerage and Drainage Company (HSDC)

Budget

9.940.000,00 €

Project description

Preparation of civil engineering guide plans, supply of 6 auger pumps with a capacity of 3m³/s each, 3 vertical pumps with a capacity of 3m³/s each, automated rough screening & fine screening (PS2), hydraulic valves & stop logs, lifting equipment, instrumentation, low voltage electrical panels, systems automation and monitoring, centralised remote control for the three pumping stations.